Pays de livraison
Livraison gratuite aux États-Unis continentaux à partir de 50 $ US. Des conditions s'appliquent
Pays sélectionné
Référence fabricant
24LC128T-I/MS
Tèlèchargez les modèles CAD pour ce produit. En savoir plus sur SnapMagic.
2500 par Reel
MSOP-8
Surface Mount
Informations de livraison:
Code HTS:
ECCN:
Informations PCN:
Product Category: MemoryNotification Subject: CCB 7788.001 Final Notice: Qualification of palladium coated copper with gold flash (CuPdAu) as a new bond wire material for 24CS64, 24CS32, 24AA64, 24FC64, 24LC32AF, 24LC64, 24AA32AF, 24LC32A, 24AA32A, 24AA64F, 24LC64F, 24FC64F, 24LC128, 24FC128, 24AA128, 24CS128, 24CS256, 24LC256, 24AA256, 24FC256, 24CS512, 24CSM01 and 25CSM01 device families available in 8L MSOP (3x3mm) package at MTAI assembly site.Description of Change: Qualification of palladium coated copper with gold flash (CuPdAu) as a new bond wire material for 24CS64, 24CS32, 24AA64, 24FC64, 24LC32AF, 24LC64, 24AA32AF, 24LC32A, 24AA32A, 24AA64F, 24LC64F, 24FC64F, 24LC128, 24FC128, 24AA128, 24CS128, 24CS256, 24LC256, 24AA256, 24FC256, 24CS512, 24CSM01 and 25CSM01 device families available in 8L MSOP (3x3mm) package at MTAI assembly site.Pre and Post Summary Changes: See attached SPCN document for more detailsReason for Change: To improve manufacturability by qualifying palladium coated copper with gold flash (CuPdAu) as a new bond wire material.Estimated First Ship Date: 14 September 2026 (date code: 2638)
Description of Change:Added E-temp offerings to the AA and FC devices.Reason for Change: To improve productivity. Date Document Changes Effective: 25 Feb 2025
Description of Change:Qualification of U08D as a new fabrication location for selected AT24C128C, 24LC128, 24FC128, and 24AA128 device families available in various packages.Reason for Change:To improve manufacturability and on-time delivery performance by qualifying U08D as a new fabrication location.Estimated First Ship Date:27 March 2025 (date code: 2513)Revision History:January 18, 2025: Issued initial notification.February 19, 2025: Issued final notification. Attached the Qualification Report. Provided estimated first ship date to be March 27, 2025.
Description of Change:Qualification of U08D as a new fabrication location for selected AT24C128C, 24LC128, 24FC128, and 24AA128 device families available in various packages.Reason for Change:To improve manufacturability and on-time delivery performance by qualifying U08D as a new fabrication location.
Statut du produit:
Stock conservé dans l'entrepôt du fabricant. Sous réserve de disponibilité et de temps de transit.