Shipping Country
Free shipping within the continental US over $50. Conditions apply
Select Country
Manufacturer Part #
1241380-1
Download the CAD models for this product. Learn more about SnapMagic.
4500 per Reel
Cable Mount
Shipping Information:
COO is assigned at time of shipping and cannot be selected during the ordering process. All documents will indicate COO at time of shipping
HTS Code:
ECCN:
PCN Information:
General Product Description:Multiple Parts NumbersDescription of Changes"FOR CUSTOMERS IN NA REGION ONLY! Adding TE Kurim for alternative source. PN is currently in series production at that location"Reason for Changes:Product improvement.Additional part source to improve delivery constraintsFirst Date To Ship (Changed Parts Only): 11-MAY-2026
General Product Description:PCN_A_01_OthersType of Change Manufacturing Location ChangeDescription of ChangesThis product Change Notification (PCN) is to inform about a tool transfer, from a TE Speyer to TE Dinkelsbuehl, according to VDA trigger matrix no. 29 and AIAG section 3.1 item 4. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. Internal release process is ensured by TE, including product validation as per OEM/CAM requirements (when applicable). Validation will be initiated and completed according to project plan, as soon as samples are available. PPAP will be prepared (as per agreements between the two parties, including the negotiated TE trigger matrix), a request via ePPAP (via www.te.com or request to TE Sales representative) needs to be initiated by Customer 4 weeks prior to implementation date. In case no request is obtained till above mentioned date, PPAP will be considered as approved, and the change is considered as fully releasedReason for Changes:As a result of a thorough analysis of demand picture, matching our customer needs, we are going to optimize value stream of PNs in scope of this PCN. This transfer will support the need of our customers for shorter lead-times and optimized value streamsFirst Date To Ship (Changed Parts Only):26-JAN-2026
Description of ChangesFor China local customer requirement MCP 1.5 k, the new duplication production tool (11-1989997) in TE Suzhou plant for production to support only Asia-Pacific market. For this new duplication production tool, it will shorten the L/T of delivery time and offer good service for Asia-Pacific market. The PCN will only impact Ap market, Not impact EMEA customer.Reason for Changes:Customer Request.Suzhou Plant Production capability increases, The new manufacturing location is under quality management system according to the standard industry requirements. An internal release based on our specifications will be executed before any parts will be delivered, which guarantees the performance.
Description of Changes:The Suzhou factory in China will replace the following series of part numbers' outer carton. Compared with the old version of the outer box, the size of the new outer box is consistent with the original outer box, only the material and model of the outer box are changed, which does not affect the product itself. Meanwhile, the new carton has passed the drop test of TE, which is in line with the product packaging specifications of TE, it can ensure product safety.Reason for Changes:Customer Request. Dear customer, we hereby inform you that the part number in the following attachment will be changed to a new outer box. The size of the new outer box is the same as the old one, only the material and model are changed. At the same time, the new carton has passed TE's drop test and conforms to TE's product packaging specifications to ensure the safety of terminals in the carton. This change does not involve the change of the product itself, but only changes the outer packaging box of the product, which does not affect the product.
Reason for Changes:Dear Customer, as result of our continuous strive for improving our processes, we hereby inform you about a new Manufacturing Location Change. The new source is executed by following a strict procedure, which guarantees no negative influence on quality, ability to supply and form-fit-function of the concerned products. Please after receiving this notification, PPAP and samples must be requested by ePPAP System in 10 days, in case you do not request in ePPAP, TE will understand that this change was accepted.
Description of Changes:FOR CUSTOMERS IN NA REGION ONLY! Adding TE-Shanghai, China for alternate source.Reason for Changes:Product improvement. Additional part source to improve delivery constraints.
Description of ChangesThis PCN is applied only for customers that buy components from TE Connectivity Brazil. Dual Source - Added new Manufacturing location. Following Part Number will be sourced from TE Connectivity Czech Republic to Brazil in addition to current sourcing from TE Connectivity North America.Reason for Changes:Dear Customer, as result of our continuous strive for improving our processes, we hereby inform you about a new Manufacturing Location Change. The new source is executed by following a strict procedure, which guarantees no negative influence on quality, ability to supply and form-fit-function of the concerned products. Please after receiving this notification, PPAP and samples must be requested by ePPAP System in 10 days, in case you do not request in ePPAP, TE will understand that this change was accepted.
Part Status:
Inventory held at our manufacturer's warehouse. Subject to availability and transit time.