Pays de livraison
Livraison gratuite aux États-Unis continentaux à partir de 50 $ US. Des conditions s'appliquent
Pays sélectionné
Référence fabricant
MCP2561FD-E/SN
Tèlèchargez les modèles CAD pour ce produit. En savoir plus sur SnapMagic.
100 par Tube
SOIC-8
Surface Mount
Informations de livraison:
Le pays d’origine (COO) est attribué au moment de l’expédition et ne peut pas être sélectionné lors du processus de commande. Tous les documents indiqueront le COO au moment de l’expédition.
Code HTS:
ECCN:
Informations PCN:
***UPDATE OF PCN118511 (NOTICE TYPE MATERIAL CHANGE) ***Revision History: January 16, 2026: Issued initial notification. January 19, 2026: Re-issued initial notification to update notification subject.Product Category: Interface- Controller Area Network (CAN)Description of Change: Qualification of palladium coated copper with gold flash (CuPdAu) as a new wire material and QMI519 as a new die attach material for selected MCP2542FD, MCP2542WFD, MCP2544FD, MCP2544WFD, MCP2557FD, MCP2558FD, MCP2561, MCP2561FD, MCP2562 and MCP2562FD device families available in 8L SOIC (.150in) package.Reason for Change: To improve manufacturability by qualifying palladium coated copper with gold flash (CuPdAu) as a new wire material and QMI519 as a new die attach to standardize the use of PFAS free material at MTAI assembly site.Estimated Qualification Completion Date: May 2026
Product Category: Interface- Controller Area Network (CAN)Description of Change: Qualification of palladium coated copper with gold flash (CuPdAu) as a new wire material and QMI519 as a new die attach material for selected MCP2542FD, MCP2542WFD, MCP2544FD, MCP2544WFD, MCP2557FD, MCP2558FD, MCP2561, MCP2561FD, MCP2562 and MCP2562FD device families available in 8L SOIC (.150in) package.Reason for Change: To improve manufacturability by qualifying palladium coated copper with gold flash (CuPdAu) as a new wire material and QMI519 as a new die attach to standardize the use of PFAS free material at MTAI assembly site.Estimated Qualification Completion Date: May 2026Note: Please be advised the qualification completion times may be extended because of unforeseen business conditions however implementation will not occur until after qualification has completed and a final PCN has been issued. The final PCN will include the qualification report and estimated first ship date. Also note that after the estimated first ship date guided in the final PCN customers may receive pre and post change parts.
Statut du produit:
Stock conservé dans l'entrepôt du fabricant. Sous réserve de disponibilité et de temps de transit.