Shipping Country
Free shipping within the continental US over $50. Conditions apply
Select Country
Manufacturer Part #
282105-1
Download the CAD models for this product. Learn more about SnapMagic.
1 per Box
Shipping Information:
COO is assigned at time of shipping and cannot be selected during the ordering process. All documents will indicate COO at time of shipping
HTS Code:
ECCN:
PCN Information:
General Product Description:MCTV import; cancel the stamp on the label, only influence TE china 1043 plantDescription of ChangesMCTV import, cancel the stamp on the label, use MCTV to confirm the inspection operator Reason For Change: Product improvement.MCTV import, cancel the stamp on the label, use MCTV to confirm the inspection operatorFirst Date To Ship (Changed Parts Only):08-FEB-2026
General Product Description:Packaging process changesDescription of ChangesThe packaging is changed from small PE film bags to large PE bag packaging, and the packaging quantity per box remains unchanged.Reason for Changes:New specification. New packaging specifications, Packaging changes to save packaging materials, the material numbers involved are as follows China 282105-1/2434999-1/2441055-1/282106-1 2435001-1/2441056-1/282104-1/2434996-1/2356872-1/2374590-1First Date To Ship (Changed Parts Only):15-SEP-2025
Description of Changes: This product change notification (PCN) is to inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of February 20, 2024 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders in case adjustments have not taken place in time.Reason for Changes: New specification. To assure standardized and uniform packaging for each basic product part number, to improve sustainability and minimize quality risks.
General Product Description:Multiple part numbersDescription of ChangesAdding TE Kunshan for alternate manufacturing source. PN is currently in series production at that location.Reason for Changes:Product improvement.Additional part source to improve delivery constraints.First Date To Ship (Changed Parts Only: 14-APR-2023
Part Status:
These connectors fulfill all the requirements prescribed by the various automotive and industrial standards.
Features:
Inventory held at our manufacturer's warehouse. Subject to availability and transit time.