Shipping Country
Free shipping within the continental US over $50. Conditions apply
Select Country
Manufacturer Part #
DF63-2S-3.96C
Download the CAD models for this product. Learn more about SnapMagic.
100 per Bulk
Wire Mount
Shipping Information:
HTS Code:
ECCN:
PCN Information:
Description:We would like to inform you that, with regard to the packaging bags used for our connector products, the procurement of certain raw materials has become unstable due to the escalating situation in the Middle East. In order to maintain a stable supply, we have decided to review the specifications of our product packaging bags. Accordingly, as an interim measure, we will change the specifications of the packaging bags as described on the attached SPCN document.Changes Current: Bags printed with HRSRevised: Plain bags (without printing)Timing of Change over:The changeover is scheduled for shipments from June 2026 onward
Type: Change of production locationDescription:Before the change: Supplier AAfter the change: Supplier FTReason:To ensure stable supplyScheduled delivery date of mass production products: Scheduled on 5/2026*We will relocate the mold. We expect the product quality to remain at the same level as before the relocation, but we will measure the product dimensions to confirm that there are no issues.Please acknowledge the suppliertw.cn.sg.futurepcn.5q@hirose-gl.com
Notice of relocation of production location, The contents of change -Place of production:Current address:87-3 Okawara, Koriyama City, Fukushima Prefecture?Koriyama Central Industrial Park? New address:1-16-1/19 Kamiizushima, Koriyama City, Fukushima Prefecture -Koriyama Seibu Daiichi Industrial Park. Reason for relocation:At our Koriyama Factory (Fukushima Prefecture), we plan to move to a new factory (in Koriyama City) in order to build a system for increasing production of connectors for automobiles and general industrial machinery and to strengthen business continuity planning (BCP) by avoiding disaster risks. ?Change range? Due to the relocation to the new factory, the production location of the items produced in the current factory will be relocated. There are no changes to facilities or management systems. 3. Timing of change A new factory is currently under construction and is scheduled to start operation in May 2024.
Notice of relocation of production location and request for consent.The contents of changePlace of productionCurrent address87-3 Okawara, Koriyama City, Fukushima Prefecture?Koriyama Central Industrial ParkNew address-16-1/19 Kamiizushima, Koriyama City, Fukushima PrefectureKoriyama Seibu Daiichi Industrial ParkReason for relocationAt our Koriyama Factory (Fukushima Prefecture), we plan to move to a new factory (in Koriyama City) in order to build a system for increasing production of connectors for automobiles and general industrial machinery and to strengthen business continuity planning (BCP) by avoiding disaster risks
Part Status:
On Order
Inventory held at our manufacturer's warehouse. Subject to availability and transit time.