Shipping Country
Free shipping within the continental US over $50. Conditions apply
Select Country
Manufacturer Part #
1011-228-0205
Download the CAD models for this product. Learn more about SnapMagic.
1 per Box
Shipping Information:
HTS Code:
ECCN:
PCN Information:
Product Description: AFFECTS USA CUSTOMERS - Distribution Center change from Tullahoma, TN to Hermosillo, MXGeneral Description of ChangesThis is a notification only that our current shipping location will change as described, Current location: TE Connectivity Tullahoma CFC, 67 Murray Drive, Tullahoma, TN, 37388 USA (DUNS 118844485). New location: ML1 Hermosillo, HL30-HL40 Distribution Center Address: Corcom /Calle Latitud Sur No. 74, Parque Industrial Latitud, Hermosillo, Sonora, M xico, C.P. 83175 (DUNS Code: 81-2819-636). Tucson Cross-Dock Address: TE Connectivity / ILS, 8350 East Old Vail Road, Tucson, AZ, 85747 USA. No fit/form/function change, No manufacturing location change, No materials change related to this notification. Please note this change does not apply to LADD orders. See attached Customer Notification Letter.Reason for Changes:Dear Customer, we hereby inform you about the distribution center location chance because we are optimizing delivery performance and refining logistics operations to provide a more dependable and seamless service experience.First Ship Date of Changed Items (Changed Parts Only):10-NOV-2025
Description of Changes:The ICT BU of TE is making a change to the molding machine process parameter settings for improvement to optimize the production capacity and the percentage used of regrind with our molding supplier located in Germany only. The molding tools located in China with marked parts CN per Note 13 as shown on the customer drawing are not impacted by this notification for the part numbers listed below. These PNs are TE proprietary designs, therefore considered catalog/general market product. PPAP and/or sample requests must be submitted within 14 days of PCN submission via ict-ppap-request@te.com or ePPAP system. Submission will not occur without request. If PPAP requested, disposition response is required within 14 days of submit date or it will be considered approved. Product drawings are affected.Reason for Changes:The change is necessary to investigate and seek to implement molding process improvement actions in production. The change does not impact connector performance as the covers must still comply with measurement and product specification requirements. IMPORTANT: The current and previous revisions of these parts can be used interchangeably in the field. The change is being phased in gradually and previous revision can remain stocked until use. Shipments of both configurations may be mixed.
Part Status:
On Order
Inventory held at our manufacturer's warehouse. Subject to availability and transit time.