Manufacturer Part #
1670146-3
MCON 1.2 CB REC SWS AG
| | |||||||||||
| | |||||||||||
| Mfr. Name: | TE Connectivity | ||||||||||
| Standard Pkg: | Product Variant Information section Available PackagingPackage Qty:6500 per Reel | ||||||||||
| Date Code: | 2512 | ||||||||||
TE Connectivity 1670146-3 - Product Specification
Shipping Information:
ECCN:
PCN Information:
*** Update on FPCN106979 - SPCN PCN P-24-026283 ***General Product Description:Multiple Parts NumbersDescription of ChangesThis is a supplemental/addendum PCN to PCN P-24-026283. TE is notifying its customers of the installation of two new plating lines at the Pegg Road facility in Greensboro, North Carolina. TE is replacing an aged plating line and adding capacity to better serve TE s business and customer needs. TE part testing and qualification will follow all standard guidelines to ensure the product coming off the new lines meets the same performance and quality as current production parts. TE will proceed based on the understanding the proposed PPAP submission is acceptable for the final approval by customer. The new plating lines are installed and the estimated time for PPAP availability is 10/30/2025 with expected SOP 12/15/2025. "Reason for Changes:Product improvement.TE is replacing an outdated plating line that has been in operation for 28 years. The plating technology advancement will allow TE to remove one aged plating line and replace it with two new plating lines which will increase capacity.First Date To Ship (Changed Parts Only):15-DEC-2025
General Product Description:MCON 1.2 CB REC SWSDescription of ChangesDescription of Changes: This PCN is applied only for customers that buy this Part Number from TE Connectivity Brazil. Dual Source - Added new Manufacturing location. Part Number will be sourced from TE Connectivity TE Greensboro to TE Brazil before be supplied from TE Brazil to the customer. TE Connectivity TE Greensboro has supplied this item for a long time and is now being added as addition source to attend the TE Brazilian plant demand.Reason for Changes:Document clarification.Document clarification.Document clarification. Dear Customer, as result of our continuous strive for improving our processes, we hereby inform you about a new Manufacturing Location Change for Dual Sourcing. The new source is executed by following a strict procedure, which guarantees no negative influence on quality, ability to supply and form-fit-function of the concerned products. Please after receiving this notification, PPAP and samples must be requested by ePPAP System in 10 days, in case you do not request in ePPAP, TE will understand that this change was accepted.First Date To Ship (Changed Parts Only):10-NOV-2025
Description of Changes:Dear customer, we would like to inform you about new coding 1670146-3 PN added on mass production Tool NO 11-1829618 in China TE Suzhou plant for production. P-25-028607 cannot be referred.Reason for Changes:Customer Request. As a result of our continuous strive for capacity increase of our production, we hereby inform you upfront about new coding 1670146-3 add on mass production tool 11-1829618 in China TE Suzhou plant, which is under construction in order to meet all specification requirements to cover increasing marked demand and which will run in addition to current one.P-25-028607 cannot be referred.
Description of Changes:The Suzhou factory in China will replace the following series of part numbers' outer carton. Compared with the old version of the outer box, the size of the new outer box is consistent with the original outer box, only the material and model of the outer box are changed, which does not affect the product itself. Meanwhile, the new carton has passed the drop test of TE, which is in line with the product packaging specifications of TE, it can ensure product safety.Reason for Changes:Customer Request. Dear customer, we hereby inform you that the part number in the following attachment will be changed to a new outer box. The size of the new outer box is the same as the old one, only the material and model are changed. At the same time, the new carton has passed TE's drop test and conforms to TE's product packaging specifications to ensure the safety of terminals in the carton. This change does not involve the change of the product itself, but only changes the outer packaging box of the product, which does not affect the product.
Description of Changes: This product change notification (PCN) is to inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. Change was already communicated via P-23-024531 but new PCN informs about postponed activation date: As of February 20, 2024 we will increase the delivery unit & the min. order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders.Reason for Changes: New specification. To assure standardized and uniform packaging for each basic product part number, to improve sustainability and minimize quality risks.
General Product Description:Change in Delivery Unit & Minimum Order QuantityDescription of Changes:This product change notification (PCN) is to inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of July 20, 2023 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN.Reason for Changes:New specification.New specification to assure standardized and uniform packaging for each basic product part number, to improve sustainability and minimize quality risks.
To continue supporting customer demand it is important that we qualify all global supply sources of product to drive quicker supply chain recovery. The scope is to approve the tool that runs in our China region for parts that rae currecbtly puchased to aid in speedy recovery of parts and have a greater ablity to service demand spikes in the future.
Part Status:
Available Packaging
Package Qty:
6500 per Reel