Manufacturer Part #
1-1355200-1
MCP2,8BU-GEH ASSY2P
| | |||||||||||
| | |||||||||||
| Mfr. Name: | TE Connectivity | ||||||||||
| Standard Pkg: | Product Variant Information section Available PackagingPackage Qty:1000 per Box | ||||||||||
| Date Code: | 2219 | ||||||||||
TE Connectivity 1-1355200-1 - Product Specification
Shipping Information:
ECCN:
PCN Information:
General Product Description:MCP2,8REC HSG ASY2PDescription of ChangesThis Product Change Notification (PCN) applies exclusively to customers who purchase the component through TE Connectivity Brazil. We would like to inform you that the component Housing PN X-1355339-X, used in the assembly PN X-1355200-X, will be transitioned to an outsourced manufacturing process. Please note that the assembly PN X-1355200-X will continue to be carried out by TE Connectivity. The only change is that TE Connectivity will now incorporate the Housing X-1355339-X, supplied by a certified external manufacturer, into the assembly process, but TE Connectivity will continue to supply this product to their customers.Reason for Changes:Dear customer , as result of our continuous strive for improving our process, we hereby inform you about this outsourcing. This outsourcing is executing by following a strict procedure which guarantees no negative influence on quality, ability to supply and form-fi t-function of this product. Please after receiving this notification, PPAP and samples must be requested by ePPAP System in 10 days. In case of you do not request in ePPAP, TE Connectivity will understand and considered that this change was accepted.First Date To Ship (Changed Parts Only):07-NOV-2025
Description of Changes: This product change notification (PCN) is to inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of February 20, 2024 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders in case adjustments have not taken place in time.Reason for Changes: New specification. To assure standardized and uniform packaging for each basic product part number, to improve sustainability and minimize quality risks.
Description of ChangesThis Product Change Notification (PCN) is to inform about a transfer of part number 1355341-1 from TE Connectivity San Salvo, Italy, to TE Connectivity Esztergom, Hungary. The transfer follows a strict procedure, which fully maintains quality, ability to supply and form-fit-function of the concerned products, including internal release and product validation as per OEM/CAM requirements, where applicable. The new manufacturing location operates under a certified quality management system in accordance with defined requirements. PPAP/PSW will be prepared (as per agreements between the two parties, including the negotiated TE trigger matrix), a request via ePPAP (via www.te.com or request to TE Sales representative) needs to be initiated by Customer within 2 weeks after receiving of this PCN. In case no request is obtained till above mentioned date, PPAP/PSW will be considered as approved and the change is considered as fully released.Reason for Changes:As a result of a thorough analysis of demand picture, matching our customer needs, we are going to optimize value stream of PNs in scope of this PCN. This transfer will support the need of our customers for shorter lead-times and optimized value streams.
General Product Description:MCP2,8BU-GEH ASSY2PDescription of ChangesThis Product Change Notification (PCN) is to inform about a transfer of tools and/or processes from TE CZ Kurim to TE HUN Esztergom. The transfer follows a strict procedure, which fully maintains quality, ability to supply and form-fit-function of the concerned products, including internal release and product validation as per OEM/CAM requirements, where applicable. The new manufacturing location operates under a certified quality management system in accordance with defined requirements. PPAP/PSW will be prepared (as per agreements between the two parties, including the negotiated TE trigger matrix), a request via ePPAP (via www.te.com or request to TE Sales representative) needs to be initiated by Customer within 2 weeks after receiving of this PCN. In case no request is obtained till above mentioned date, PPAP/PSW will be considered as approved and the change is considered as fully released. The transfer includes the assembly machine and also the related molding tools.Reason for Changes:As a result of a thorough analysis of demand picture, matching our customer needs, we are going to optimize value stream of PNs in scope of this PCN. This transfer will support the need of our customers for shorter lead-times and optimized value streams.
General Product Description: MCP2,8BU-GEH ASSY2PDescription of ChangesThis Product Change Notification (PCN) is to inform about a transfer of tools and/or processes
General Product Description:Multiple part numbersDescription of ChangesAdding TE Suzhou for alternate manufacturing source. PN is currently in series production at that location.Reason for Changes:Product improvement.Additional part source to improve delivery constraints.First Date To Ship (Changed Parts Only):18-APR-2023
General Product Description:MCP2,8 SOCKET HOUSING 2POSDescription of ChangesTE Connectivity Brazil would like to inform about the local production of the part number listed in this PCN.Reason for Changes:Product improvement.Brazilian production is to better meet customer demands and improve our delivery.The Brazil manufacturing location operates under certified quality management system in accordance with standard concerned automotive requirements. A TE internal release test based on relevant part specifications will be executed before delivery. PPAP will be submitted before SOP for all customers which had required.First Date To Ship (Changed Parts Only): 31-MAR-2023
Part Status:
Available Packaging
Package Qty:
1000 per Box