Manufacturer Part #
1924464-1
DEUTSCH Socket With Insulation Support Wire Size 20-18 Gold Plated
| | |||||||||||
| | |||||||||||
| Mfr. Name: | TE Connectivity | ||||||||||
| Standard Pkg: | Product Variant Information section Available PackagingPackage Qty:4000 per Reel | ||||||||||
| Date Code: | 2523 | ||||||||||
TE Connectivity 1924464-1 - Product Specification
Shipping Information:
ECCN:
PCN Information:
Description of ChangesThe Industrial and Commercial Transportation business unit of TE Connectivity is adding new capacity tooling for HDSF Size 16 Socket.Reason for Changes:TE hereby inform you of this change. The new tooling is necessary to maintain current customer demand. The added tooling does not impact connector performance. IMPORTANT: No fit, form or function change. Parts off the new tool are identical to current production. Shipments from current and new tooling configurations may be mixed.First Ship Date of Changed Items (Changed Parts Only): 30-JAN-2026
Description of ChangesThe Industrial and Commercial Transportation business unit of TE Connectivity is making a change to plating line.Reason for Changes:TE hereby inform you of this change. The change is necessary due to the age of the existing plating line. Existing equipment cannot be retrofitted to meet current standards and best practices. Data monitoring features allow for improved event reaction & quality monitoring systems. The current and previous revisions of these parts can be used interchangeably in the field. Shipments of both configurations may be mixed.First Ship Date of Changed Items (Changed Parts Only): 31-JAN-2026
Description of ChangesNOTIFICATION ONLY!!! This is a notice of packaging change which contains stamped product reels for shipping. This change is specific to the reel flange which holds the stamped product associated with this notification.Reason for Changes:Document clarification.Dear Customer, we hereby inform you about a change of packaging material. The reason for this change is to increase the integrity of the packing system. The change follows a strict procedure, which fully maintains quality, ability to supply and form-fit-function of the concerned products. The packaging implementation follows a certified quality management system in accordance with standard automotive requirements.
DESCRIPTION :-TE is notifying its customers of the installation of two new plating lines at the Pegg Road facility in Greensboro, North Carolina. TE is replacing an aged plating line and adding capacity to better serve TE s business and customer needs. The aged plating line was decommissioned and removed from use 10/31/2023. TE part testing and qualification will follow all standard guidelines to ensure the product coming off the new lines meets the same performance and quality as current production parts. If there are no responses to the PCN from the customers by 10/31/2024, TE will proceed based on the understanding the proposed PPAP submission is acceptable for the final approval by customer. The new plating lines will be installed and the estimated time for PPAP availability is 4/18/2025 with expected SOP 7/15/2025.REASON: Product improvement. TE is replacing an outdated plating line that has been in operation for 28 years. The plating technology advancement will allow TE to remove one aged plating line and replace it with two new plating lines which will increase capacity.
Description of Changes-TE is notifying its customers of the installation of two new plating lines at the Pegg Road facility in Greensboro, North Carolina. TE is replacing an aged plating line and adding capacity to better serve TE s business and customer needs. The aged plating line was decommissioned and removed from use 10/31/2023. TE part testing and qualification will follow all standard guidelines to ensure the product coming off the new lines meets the same performance and quality as current production parts. If there are no responses to the PCN from the customers by 10/31/2024, TE will proceed based on the understanding the proposed PPAP submission is acceptable for the final approval by customer. The new plating lines will be installed and the estimated time for PPAP availability is 4/18/2025 with expected SOP 7/15/2025.
Part Status:
Available Packaging
Package Qty:
4000 per Reel